Power + Line | Engineering Solutions

What We Do


Power + Line is an engineering construction company that works mainly in areas of restricted access, where Health & Safety and meticulous planning are at a premium.

We deliver a wide range of construction services, including ground works, pipe-laying and tunnelling, cable extraction, concrete formwork, surfacing, drainage and public utility works.

For Power + Line, the key element is to work where our attention to detail, our understanding of risk and our ability to resource a project effectively can be put to best use.

Whether the task is beside a railway track or within the main sewer network, if the job is time critical and needs rigorous planning from a health and safety point of view then Power + Line should be your first port of call.



FORS – Bronze Accreditation – Aug 2022


Delighted to confirm that Power and Line Ltd have achieved the Bronze level of accreditation with FORS. Congratulations to all involved. The company now wish to work towards FORS SILVER accreditation. To show the company commitment to best practice in safety, efficiency and environmental protection.

Read More →

UVDB Verify 2022


Delighted that Power + Line has again passed the UVDB Verify audit with flying colours. Congratulations to all involved!

Read More →

July 2021 – ISO 9001:2015, ISO 14001:2015 & Migration to ISO 45001:2018


A triple success this month, as we received our certificates for ISO-19001:2015, ISO 14001:2015 and Migration to ISO 45001:2018 – Quality, Environmental and Health & Safety – Integrated Management. Copies of each certificate are displayed in the “Downloads” section available from the front page. Once again, a huge thank-you to all involved!

Read More →


June 2023 – FORS – Bronze


Delighted to confirm that Power and Line Ltd have achieved the Bronze level of accreditation with FORS for a further year starting August 2023 to August 2024. Congratulations to all involved.

Read More →



UVDB Verify 2021


Delighted that Power + Line has again passed the UVDB Verify audit with flying colours. Congratulations to all involved!

Read More →

New A12 Noise Barrier


Power and Line Ltd are proud to announce their contribution to an installation of a new style noise barrier which is a first for the UK. The works took place during November 2020. This is a new barrier which is both artwork and acoustic shield intended to dramatically reduce the impact of traffic noise on … Continue reading New A12 Noise Barrier

Read More →


Deprecated: Function the_block_template_skip_link is deprecated since version 6.4.0! Use wp_enqueue_block_template_skip_link() instead. in /home/knev65wsfzud/public_html/wp-includes/functions.php on line 6078